2023 Capital Campaign

We are God’s accomplishment, created in Jesus Christ to do good things. - Ephesians 2:10

Repair

    • Foundation around the front of the sanctuary to prevent water from entering the building

    • Replacement of 100 year old plaster ceilings in the sanctuary

    • Repainting exterior and selected interior spaces

    • Replacement of rotted wood on exterior

    • New roof, with added insulation, to the Education building

    • New air conditioning units for the education building

    • New mini-splits for the Boyd wing

Reclaim

    • Move the nursery from the education building to the 3rd floor of the Boyd wing

    • Move the Session and History rooms to the unused space above the offices, while also creating flex space and additional meeting rooms

    • Utilize storage space below the narthex

Revitalize

    • Installation of push button operated doors at the office entrance and in a rear sanctuary door to aid in accessibility for people with disabilities

    • New signs inside and out that are up-to-date and present a cohesive design

    • New LED sign to share what the church is doing with passers by

    • Rethink ministry options for the newly vacant second floor of the Education building

Want to learn more? Check out the campaign brochure:

A video walkthrough

Take a trip around First Presbyterian and view several of the spaces that will receive much needed attention as part of our capital campaign.

Fundraising Goal:

$600,000


Total Raised: